Functions/ What can I do here?
All about Scheduling:
The scheduling page is an optimal list, automatically built based off Customer Order due date, production & lead time, and priority. The schedule is presented in multiple ways, based on multiple parameters like line items and Operations. There is a combined list available too. The work centre displays the scheadule by operations for each resouce group. Users are allowed to manually override in the event where circumstances change.
Navigate to the Scheduling product module. The default schedule will be a combined scheduled based off on Line items availability and Operations priority.
You may choose to view the individual schedules by toggling between “Line items” and “Operations”.
The schedule card displays the Due date, Priority level (High, Normal) and how many parts are active or ready.
There are two ways to Override the Schedule.
Method 1:
Simply click on the 6 dots and drag it to a desired position.
(Video title: 1_manual override.gif)
Scheduling > Drag and Drop